News

Pato ready to implement PM’s decision on Manus Island

InterOil has confirmed gas flow and an increased condensate ratio in an additional 131 feet (40 metres) of pay, which is the vertical thickness of reservoir rock estimated to contain hydrocarbons and be capable of contributing to production rates in one of its operation sites.

Related posts

Andagali: PNG Power Staff End Industrial Strike

EMTV Online

Miss Pacific Balanced Fund Announced

EMTV Online

29 Novemba | EMTV Nesenel Nius Long Tok Pisin

EMTV Online

Leave a Comment

error: Content is protected !!