News

K300m in school fee subsidy payout delayed

InterOil has confirmed gas flow and an increased condensate ratio in an additional 131 feet (40 metres) of pay, which is the vertical thickness of reservoir rock estimated to contain hydrocarbons and be capable of contributing to production rates in one of its operation sites.

Related posts

Gulf Wants LNG to be Exported Directly from Province

EMTV Online

Historic Port Relocation: Port of Motukea

EMTV Online

PNG Power: New Yonki Hydro-Power Station Will Reduce Beackouts

EMTV Online

Leave a Comment

error: Content is protected !!